We have finished framing the "office" portion of this workshop and have sheathed the walls with house-wrap. To properly flash the openings, the sheathing will be cut and taped to prevent moisture intrusion into the structure. Hardline has already finished the log cabin siding so that picture will be coming very soon.
Friday, July 3, 2009
Dooley
Garage / Basement Build-Out
Don't let this picture take your breath away, I know it's quite amazing: a white basement. However, it wont look like this for long. This is a "before" picture of a garage in a townhome near Perimeter Mall. Hardline is going to build out the rear portion of this garage for a "bonus" room and bathroom.
North Avenue Apartment Pool
Chastain Pool
Subscribe to:
Posts (Atom)