Here is the rendering of a new residential pool Hardline will be building. This is part of the plan we submitted for permit. This pool is approximately 500 square feet with a spa. We anticipate starting construction by the middle of June.
Here is a current picture of the Melante Drive master bedroom addition after exterior paint. You can see the contrast in roof shingle color between the new and the old, but we are going to clean the old roof shingle with Clorox to bring out the original shingle color that should help the addition blend with the existing shingle.
Here is an updated picture of the fire damage project we are working on in Powder Springs. We have already demolished the "workshop" portion of the structure where the fire started, and have completed about 70% of the framing for the "office" portion of this structure. We will not be able to start framing the "workshop" until we pour the new, larger slab.
Here is a picture a few weeks back at Melante Drive. As you can see, framing is finished and we are putting on the Cedar Shake Siding over the house wrap.
Here is a picture of a burned Workshop / Office for a Hardline sub-contractor. Hardline is going to rebuild this project for our sub-contractor. Luckily, the fire was put out before the structure became fully inflamed. The workshop portion of this structure is burned beyond repair (portion to the left) and the office that sits above the garage doors will be removed also. We are going to totally demolish and rebuild the workshop portion and take the second story off the garage to rebuild due to the fire. This structure looks like a log cabin, but the material is actually a Cypress veneer about three and a half inches thick. This is a great look without the increased cost of a true log timber. This project is in Powder Springs and we are going to submit for permit by the end of the week. We hope to start construction by the first of June once permit is received.
This is an updated picture of the Melante Drive master bedroom / bath addition. We are finished with framing the walls and are about to start on the roof. We should have this addition dried in by Friday.
This is a current picture of the master bedroom & bath addition for Melante Drive. This picture was taken just before the rain came along and muddied our project. Unfortunately, mother nature has knocked us a few days behind schedule before we can pour this slab.